Fundamentals of Engineering (FE) CIVIL CBT Exam Specifications Effective Beginning with the July 2020 Examinations
• The FE exam is a computer-based test (CBT). It is closed book with an electronic reference.
• Examinees have 6 hours to complete the exam, which contains 110 questions. The 6-hour time also includes a tutorial and an optional scheduled break.
• The FE exam uses both the International System of Units (SI) and the U.S. Customary System (USCS).
Knowledge
Number of Questions
8–12
A. Codes of ethics (professional and technical societies)
C. Licensure
B. Cost (e.g., fixed, variable, direct and indirect labor, incremental, average, sunk)
C. Analyses (e.g., break-even, benefit-cost, life cycle, sustainability, renewable energy)
D. Uncertainty (e.g., expected value and risk)
A. Resultants of force systems
C. Equilibrium of rigid bodies
A. Kinematics (e.g., particles, rigid bodies)
B. Mass moments of inertia
C. Force acceleration (e.g., particles, rigid bodies)
D. Work, energy, and power (e.g., particles, rigid bodies)
A. Shear and moment diagrams
B. Stresses and strains (e.g., diagrams, axial, torsion, bending, shear, thermal)
C. Deformations (e.g., axial, torsion, bending, thermal)
D. Combined stresses, principal stresses, and Mohr’s circle
A. Mix design of concrete and asphalt
B. Test methods and specifications of metals, concrete, aggregates, asphalt, and wood
C. Physical and mechanical properties of metals, concrete, aggregates, asphalt, and wood
A. Flow measurement
B. Fluid properties
C. Fluid statics
D. Energy, impulse, and momentum of fluids
A. Angles, distances, and trigonometry
B. Area computations
C. Earthwork and volume computations
D. Coordinate systems (e.g., state plane, latitude/longitude) E. Leveling (e.g., differential, elevations, percent grades)
A. Basic hydrology (e.g., infiltration, rainfall, runoff, watersheds)
B. Basic hydraulics (e.g., Manning equation, Bernoulli theorem, open-channel flow)
C. Pumps
D. Water distribution systems
E. Flood control (e.g., dams, routing, spillways)
F. Stormwater (e.g., detention, routing, quality)
G. Collection systems (e.g., wastewater, stormwater)
H. Groundwater (e.g., flow, wells, drawdown)
I. Water quality (e.g., ground and surface, basic water chemistry)
J. Testing and standards (e.g., water, wastewater, air, noise)
K. Water and wastewater treatment (e.g., biological processes, softening, drinking water treatment)
A. Analysis of statically determinant beams, columns, trusses, and frames
B. Deflection of statically determinant beams, trusses, and frames
C. Column analysis (e.g., buckling, boundary conditions)
D. Structural determinacy and stability analysis of beams, trusses, and frames
E. Elementary statically indeterminate structures
F. Loads, load combinations, and load paths (e.g., dead, live, lateral, influence lines and moving loads, tributary areas)
G. Design of steel components (e.g., codes and design philosophies, beams, columns, tension members, connections)
H. Design of reinforced concrete components (e.g., codes and design philosophies, beams, columns)
A. Index properties and soil classifications
B. Phase relations
C. Laboratory and field tests
D. Effective stress
E. Stability of retaining structures (e.g., active/passive/at-rest pressure)
F. Shear strength
G. Bearing capacity
H. Foundation types (e.g., spread footings, deep foundations, wall footings, mats)
I. Consolidation and differential settlement
J. Slope stability (e.g., fills, embankments, cuts, dams)
K. Soil stabilization (e.g., chemical additives, geosynthetics)
A. Geometric design (e.g., streets, highways, intersections)
B. Pavement system design (e.g., thickness, subgrade, drainage, rehabilitation)
C. Traffic capacity and flow theory
D. Traffic control devices
E. Transportation planning (e.g., travel forecast modeling, safety, trip generation)
A. Project administration (e.g., documents, management, procurement, project delivery methods)
B. Construction operations and methods (e.g., safety, equipment, productivity analysis, temporary erosion control)
C. Project controls (e.g., earned value, scheduling, allocation of resources, activity relationships)
D. Construction estimating E. Interpretation of engineering drawings